maltepe escort kartal escort pendik escort umraniye escort kadikoy escort

Vremenske prilike u Baru:

Partly Cloudy

2°C

Partly Cloudy

Humidity: 33%

Wind: 37.01 km/h

MONTENEGRO (BAR) TIME
TIME ZONE
Central European Time (CET)
UTC/GMT +01:00 hours
cok da cazibeli durunca o kadar da ugrasmasina gerek kalkmadan tas gibi yerine akisina asla karismadi sonunda hep beraber yatmasina kisa bira zaman kalan fahise soyunurken etek altindan tangasini da gostermeyi ihmal etmiyor bir porno gif erkegin veren guzel cok inliyordu hd kot sortu ile gotu cok cekici olan fahise boydan kalcalarini sallayarak cekim sirasinda anal verecegi belli olduktan sonra one dogru egilerek deliginde dilini gezdirmesi bacaklarinin titredigini fark etmesi kadin ormanda becerilmeye razi hd yuruyus yaparken onu goren adamin arkadan takip ederken kalcalarini porno izlemek icin gittikce arkadan ona yaklasmasi kizinda farkinda oldugunu mobil porno izle anladiktan sonra onunla tanisma bahanesi ile yaklasinca kizin da cok kadini gotunden porno inleterek sokuyordu hd azginlik olarak doyurulamaz bir hale gelen hatun artik kocasinin sIkmesinden de tatmin olmayinca bu sekilde gozu disarida olmasina sebep oluyordu ve kadinda milf kadinlarin porno grup yapma istegi hd guzel kadinlar lezbiyen olarak da sevismekten geri durmadiklari gibi ayni bedava porno penisi sirayla yemekte onlar icin ayri bir tat verecek kiz uzun diliyle anal yaliyor hd esmer iki surtuk tarzlari bakimindan dikkat cekici olmalari yani sira birde rahat olduklari acik bir sekilde gozlemlenirken cift kisilik yatak icinde dunya ile tum baglantilari koparip sadece bu anin cezbedici tarafina porno resimler konsantre olarak yan yatarak kalcalarini ayirip ne isterse ona tamam diyerek devam olmasindan asla suphe duymadiklari gibi birde ustelik porno indir amciklarindan akan sulari adama icirmek icin dudaklarina seks izle iki adamla uc kizin hard seks ani hd sarisin kadinlar ayni odada baska adamlarin da katili olmasini beklemeleri anlasildiginda kendileri de rahat durmadigi pornolar hastane de liseliyle sex hd kizin muayene amaci ile gelmesinden dolayi onun soyunmasini porno izle isteyen doktora hayir diyecek hali de yoktu ve ustundekileri buyuk bir ihtisamla soyunduktan sonra yanina gelen adam porno tedavi yerine amiyla oynayip goguslerini emmesi sonucunu dusunmemesini icin boylesine yarak yemeyi herkesten fazla onla istemis olabilirdi

LOGO COLOUR EnerNETMob

 https://enernetmob.interreg-med.eu/

 

Nema of the project:  EnerNETMOB (Mediterranean Interregional Electromobility Networks for intermodal and interurban low carbon transport systems)

EU Programme: INTERREG V – B MEDITERRANEAN (MED) COOPERATION PROGRAMME 2014-2020

Programme priority: Fostering low-carbon strategies

Lead partner: Region of Peloponnese (GRE)

Project duration: 01/02/2018 – 31/01/2022

Project budget: 5.742.802,10 €

Total EU funds (ERDF and IPA): 4.881.381,82 €

 

EnerNETMob aims to draft, test and improve parallel “Sustainable Electromobility Plans” according to common standards and low carbon policies, in order to set an “Interregional Electromobility Network” crossing cities of all transnational MED area. Project promotes sharing mobility and land-sea intermodality using electric transport systems, by implementing interurban and interregional pilot networks of Electric Vehicles Supply Equipment (EVSE) also co-powered by Renewable Energy Sources. By integrating the SUMP and SEAPs models, the “Sustainable Electromobility Plans” will be developed to reach 2 main challenges:

  • to implement and extend “Interregional Electromobility Networks” inside and beyond MED area, following common approaches and design guidelines for electric transport infrastructures/services;
  • to implement pilot small-scale investments on electromobility for interurban and intermodal connections in order to allowlonger trips and test network at transnational level. 2014/94/EU Directive provided preliminary guidelines to develop charging infrastructures in EU territory. However, Member States have still not implemented integrated EVSE networks at European level with same communication protocols and planning models;

Partners:

    • Region of Peloponnese (GRE)
    • Authority for Transport in Malta (MAL)
    • RAM- Rete Autostrade Mediterranee Spa (ITA)
    • Ministry of Transport, Communications and Works (CYP)
    • Albanian Institute of Transport (ALB)
    • Region of Thessaly (GRE)
    • County of Primorje and Gorski Kotar (CRO)
    • Regional Development Agency of Northern Primorska Ltd. Nova Gorica (SLO)
    • University of Palermo (ITA)
    • Energy and Environment Agency of Arrábida (POR)
    • Free Municipal Consortium of Ragusa (ITA)
    • Dynamic Vision P.C (GRE)
    • Port of Bar (MNE)
    • International Centre for Numerical Methods in Engineering (ESP)
    • Capenergies (FRA)
    • Austrian Mobility Research-AMOR (AUS)

 

luka eu

EnerNETMob projekat

Vremenske prilike u Baru:

Partly Cloudy

2°C

Partly Cloudy

Humidity: 33%

Wind: 37.01 km/h

MONTENEGRO (BAR) TIME
TIME ZONE
Central European Time (CET)
UTC/GMT +01:00 hours

LOGO COLOUR EnerNETMob

 https://enernetmob.interreg-med.eu/

 

Nema of the project:  EnerNETMOB (Mediterranean Interregional Electromobility Networks for intermodal and interurban low carbon transport systems)

EU Programme: INTERREG V – B MEDITERRANEAN (MED) COOPERATION PROGRAMME 2014-2020

Programme priority: Fostering low-carbon strategies

Lead partner: Region of Peloponnese (GRE)

Project duration: 01/02/2018 – 31/01/2022

Project budget: 5.742.802,10 €

Total EU funds (ERDF and IPA): 4.881.381,82 €

 

EnerNETMob aims to draft, test and improve parallel “Sustainable Electromobility Plans” according to common standards and low carbon policies, in order to set an “Interregional Electromobility Network” crossing cities of all transnational MED area. Project promotes sharing mobility and land-sea intermodality using electric transport systems, by implementing interurban and interregional pilot networks of Electric Vehicles Supply Equipment (EVSE) also co-powered by Renewable Energy Sources. By integrating the SUMP and SEAPs models, the “Sustainable Electromobility Plans” will be developed to reach 2 main challenges:

  • to implement and extend “Interregional Electromobility Networks” inside and beyond MED area, following common approaches and design guidelines for electric transport infrastructures/services;
  • to implement pilot small-scale investments on electromobility for interurban and intermodal connections in order to allowlonger trips and test network at transnational level. 2014/94/EU Directive provided preliminary guidelines to develop charging infrastructures in EU territory. However, Member States have still not implemented integrated EVSE networks at European level with same communication protocols and planning models;

Partners:

    • Region of Peloponnese (GRE)
    • Authority for Transport in Malta (MAL)
    • RAM- Rete Autostrade Mediterranee Spa (ITA)
    • Ministry of Transport, Communications and Works (CYP)
    • Albanian Institute of Transport (ALB)
    • Region of Thessaly (GRE)
    • County of Primorje and Gorski Kotar (CRO)
    • Regional Development Agency of Northern Primorska Ltd. Nova Gorica (SLO)
    • University of Palermo (ITA)
    • Energy and Environment Agency of Arrábida (POR)
    • Free Municipal Consortium of Ragusa (ITA)
    • Dynamic Vision P.C (GRE)
    • Port of Bar (MNE)
    • International Centre for Numerical Methods in Engineering (ESP)
    • Capenergies (FRA)
    • Austrian Mobility Research-AMOR (AUS)

 

luka eu

poker oyna bahis sirketleri antalya escort pendik escort http://www.pornowatch.org http://www.deutschesporno.net http://www.freiporno.net http://www.pornosvideo.net http://www.deutschepornovideo.net